As FMEA implementation aims to reduce RPN

Pick up the potential corrective actions 

A. Design changes

B. Engineered safety features

C. Safety devices

D. Warning devices

E. Procedures/training

F. All of the above 

user-image
Question added by LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)
Date Posted: 2015/02/01
Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

Most of them are correct, so

F. All of the above 

Fredy Makram Labib
by Fredy Makram Labib , R&D manager , Universal for home appliances

all the above actions ....

As Saleh
by As Saleh , Recruitment Manager , Saudi House Recruitment

I think All of the above actions 

Ridha SAIDANI
by Ridha SAIDANI , Maintenance Manager , SOMIPHOS / Technical Direction

The correct answer is : F. All of the above

Mohamed Galal Hussein Ahmed Mohamed
by Mohamed Galal Hussein Ahmed Mohamed , Technical Mnager , Fast Building Contracting Co.

I agree with all answers F- all of the above actions.

 

Mohamed Hamdy Kamal Riad
by Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM

Last Answer  : 

F. All of the above 

Deleted user
by Deleted user

Option   F  (All of the above) is the correct option 

Elke Woofter
by Elke Woofter , Project Assistant , American Technical Associates

I believe the correct choice is Option F. All of the above

Wolf Klaas Kinsbergen
by Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

For reducing the Risk Priority Number I would look at F: all of the above