The Five major levels in the manufacturing planning and control system are:
Strategic Business Plan
Production Plan (Sales and Operations Plan) SOP
Master Production Schedule MPS
Material Requirements Plan MRP
Purchasing and Production Activity Control PAC
Each level varies in
Purpose
Timespan (planning horizon)
Levelofdetail
Planning cycle (Frequency).
At each level, three questions must be answered:
What are the Priorities --- how much of what is to be produced and when?
What is the available Capacity --- what resources do we have?
How can DifferencesBetweenPriorities and Capacity be resolved?
The Five major levels in the manufacturing planning and control system are:
1) Strategic Business Plan
2) Production Plan (Sales and Operations Plan) SOP
3) Master Production Schedule MPS
4) Material Requirements Plan MRP
5) Purchasing and Production Activity Control PAC
Well answer given by all the peoples ???????????????
Strategic Business Plan
Production Plan (Sales and Operations Plan) SOP
Master Production Schedule MPS
Material Requirements Plan MRP
Purchasing and Production Activity Control PAC
1) Business plan
2) Production plan
3) Master production schedule
4) Material requirement plan
5) Purchase and production activity control