(a) Tactical plan (b) Operational plan (c) Tactical goal (d) Operational goal (e) Strategic goal.
Material handling concept: the movement of raw materials, parts and semi-finished and finished products in a vertical or horizontal, or both together in the form of payments or a single payment which includes four components:
Movement: The movement of these materials to be efficiently include transition
Place a rack to move the material to be handled from one place to another
Time and include time for the movement of these materials to the requesting party has
The quantity and includes material sizes to be transferred to the requesting her hand
Principles of Materials:155 pp handling
Material handling equipment: automatic, manual and containers containing carts and trucks paid by workers, rubber conveyor belts., Pipelines to transport liquids, electric trucks, cranes different .oimkn its proceeds in four major types
Fixed carriers: linking two points Malhumican moving horizontally or electrically Gaziat Calclalm pipe mines
industrial vehicles and often moving horizontally or invader and electrically characterized by high cost
industrial cranes moving vertically and transmits the heavy materials and assigned high investment cost and also
Alrobort or robot is characterized by investment and operational cost high
Key factors in Achtaarojhzh Handling:
tracks the movement of materials. the amount of material transported
the nature of the material transported4-handling equipment requirements
Costs
Agreed with colleagues correct answer is B
It's called operational plan in terms of operations internal KPI to create value
b) Operational plan >>>>>>>>>>>>>>>>>>>>>>>
(b) >>>>>>>>>>>>>>>> Operational plan
(b)
The given example is that of an operational plan. Operational plans help in day-to-day functioning and are developed by lower level managers. They consider time-frames of less than a year.
correct answer is (b)......................................
(b) Operational plan .
the plan will be operational plan
The correct answer is (b) Operational plan...........................
Agree with my learned colleagues above - operational plan.