Register now or log in to join your professional community.
Civil Structure
in the first we distributed all items ( socket, lighting, machines, air conditions ..... ets )
study type and how start & runining every loads
devided our loads Depends on use ( continous load & non continous )
collected our loads from end of panels up to MDB or EMDB
design every panel Separate
design MDB and transformer and R.M.U
that is for L.V. system
also for L.C. system every location we start study how to use, after that we will distributed all items ( fire alarm, camera, scada, TV, nurse call, .....etc) this distribution it Depends on using area