Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What how to calculate the amount of the actual replacement of the flat 400 square meters, up 1 meter of sand to gravel ratio of 1: 2?

user-image
Question added by Saad ALaid , Resident Civil Engineer Inspector , CEC) CONTINENTAL ENGINEERING CONSULTANT - AJMAN, UAE
Date Posted: 2015/05/20

Hola. Mi respuesta según mis cálculos seria:

(/3 ) *1 =.3 m3  de Arena +  (/3 ) *2 =.6 m3 de Grava.-    (1 /2 ).

 Ademas debemos considerar un% +  por Esponjamiento.-

More Questions Like This