When checking the efficiency of cement around the casing in workover rigs through SBT circumferntial bond log and was the result very bad what doing?

user-image
Question added by Ahmed Abdullrasool Atshan Alaskary , Drilling and Work over Engineer , BP
Date Posted: 2015/06/13
Ahmed abd El-Maksoud
by Ahmed abd El-Maksoud , Completion Engineer , Baker Hughes

You can do the following:

1-Make squeeze cement job

2- If the bad cement is around the Liner you can do also the squeeze cemnt job or  a cemented Tie-Back Liner. 

 