The third world is shifting on coal based technologies so what will be the out come
The Future of Coal Power plant is Bright however it will increase the pollution. The Coal power Plants will help to tap the coal reservoirs of Thar.
it's very bright specially in Pakistan, however it do have pollution problem.
Because of the easiest and inexpensive production of electricity the coal fired power plants are very important and future is bright.Many people think about pollution but by using electrostatic presentations the air pollution could be minimized
Easy way to generate power..but i creat pollution in atmosphere.its future is not good
I am sorry I just recently completed my Electical Engineering degree and I am not a professional so, i have no idea about your question.
Pakistan needs a score of coal-based power projects to bridge the widening gap between electricity demand and supply, said an energy expert. The country produces 16,000 megawatts of electricity and local demand variably stands at around 22,000MW. Chaudhry Abdul Qayyum, who is spearheading a key coal mining project in Thar district of Sindh, said China produces more than two-third of its electricity from coal, which cost-effectively fulfills the energy requirements of the second biggest economy of the world.
Coal Power Plants is the future of energy starved Pakistan. It will help to reduce the energy problems on short term basics. The Coal power projects will inline soon.
futer
0
Resume
Electro Mechanical ( PROJECTS MANAGER) Operation &Maintenance in Saad hospital Elkobaer installation oncology building Saad hospital Elkobaer(work with parsonJeddah branch MANGER CWC CO working international codes such as (IGBC, NEC, ASHRAE,API,DIN,SAE,IBC.
NAME
Mohey Eldeen Nasr Mohamed Elreda
DATE& PLACE OF BIRTH
JAN, 1967 EGYPT
Nationality
EGYPTIAN
E.mail
University
Faculty Of Engineering Shoubra , Cairo , Zigzags University Year May 1991 Languages: Speak &, Write English very GOOD(K.S.A deriving license)
Address &Tel
32 abdelazizst.elzehoerBenha .13111 Egypt
Experience
CWC CO.
PROJECT MANGER SWD FEB 2009-2016
PARSONS LTD OR consult JEDDAH BRANCH & PRV PROJECT WETH NWC CO. storm water O&M JEDDAH
Project Manager Of Water O&M (Well Born –SupmerisaBell Pumps -R.O Plant-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work, fire alarm ,HVAC
FEB2007–25 April 2009 SAAD TRADING &CONTRACTING K.S.A
MAINTENANCE Manager
Engineer Exp In Design And Insulation oncology building in Saad hospital Elkobaer& ALL MECHANICAL Work.PLUMBER,R.O,FIRE SYESTEM,HVACELECTERICAL WORK
PLANT Manager OF Power Generation Plant O&M Cummins K38 Pccp20* 01 M .W Plant 20 M .W MAINTENANCE (OVER HAULING)
SEPTEMBER2004–OCT2005 ELKOHRAYEF O&M K.S.A
Project Manager Of Water Project haferalbaten City O&M (Well Born –SupmerisaBell Pumps -R.O Plant-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work LOW SPEEDS 720 RPM& CATERPILLAR 3512, 3508, and 3412. MAINTENANCE (OVER HAULING),WELL PUMP, BOOSTER PUMP, DP PUMP HVAC, Plumber fire alarm
SEPTEMBER2001–SEPTEMBER 2004 MINISTRY OF DEFENSE K.S.A
Project Manager Of Water Project RAFHA IRAQI REFUGE CAMP O&M (WELL BORN –SUPMERISABELL PUMPS -R.O PLANT-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work LOW SPEEDS 720 RPM& CATERPILLAR 3512, 3508, and 3412. MAINTENANCE (OVER HAULING),WELL PUMP, BOOSTER PUMP, DP PUMP
OCTOBER 1999- SEPT.2001 MINISTRY OF ELECTRICITY & ENERGY EGYPT
NOVEMBER2005-FEB2007
DIRECTOR OF TECHNICAL WORK SHOP
OPERATION AND MAINTENANCE OF POWER ,HVAC, Plumber GENERATION (DIESEL ENGINE DUTEZ & BOX)fire alarm
MARCH 1995– OCTOBER 1999 MINISTRY OF ELECTRICITY & ENERGY EGYPT
OPERATION AND MAINTENANCE OF DIESEL ENGINE GENERATOR VOLVO, DUTEZ DIESEL HELWAN.
July 1993- March 1995 East Delta Of Bus For Transport Egypt
Director of technical work shop
Operation and maintenance Of BUS (Diesel Engine &Gearbox) ……….. (Type M.A.N & MERCEDES & SCANIA) (over Hauling of Engine &Gear Box)
Education
B.Sc. Mech. power engineer , Zigzage University Cairo (5years) EGYPT
Primary To Secondary School Egyptian School , (12YEARS) EGYPT
I have advantage in electrical work and degree from Cairo university in how to use capacitor in Power system &earthling
SINCERELY YOURS
ENG.MOHY ELDE. NASER MOH. EL REDA
MOBILE
00201020522499
very good
it will reduce to generate power considering the pollution and shortage of coal