After a project charter has been signed, what is the FIRST thing a project manager should do?

user-image
Question added by Oluwagbemi Theophilus Gade , Mep Engineer , Alliance Engineering Consultants
Date Posted: 2015/11/09
Krishna   KHASANIS  PMP
by Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

A PM has to prepare the Project Scope Statement ( using progressive eloboration ) after the project charter is signed.

Deleted user
by Deleted user

Firstly,He should do the overview of the Project details and then conduct a Risk Assessment as per COSHH Method