Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is BOQ, and why it is important for projects?

user-image
Question added by Muhammad Ishtiaq Qureshi , Assistant Control Engineer , RMI
Date Posted: 2015/12/01
JOHNSON A DIAS
by JOHNSON A DIAS , Senior Design Engineer , John Crane Sealings Systems India Pvt Ltd

BOQ is bill of quantity, it is a document used to list of parts,material used. it is used for tendering or construction.

Tanveer Hussain
by Tanveer Hussain , Hotel Shift Manager , Americinn By Wyndham

BOQ is the abbreviation of Bill of Quantities containing A to Z picture of the project. This is the comprehensive list of materials, instruments and dimensions pertaining to a particular project. The document is mostly used for seeking estimated costs of the items for a construct contract. 

Just addition information BOQ is preliminary guidance for everyone to know the list of quantities & types of all material to required into the projects execution. Into the bid/tender stage, it is important to enable the the bidders generate the project execution cost more precision. Also the BOQ is part of important thing to describe the scope of work/supply of the respective projects.

Usually any difference will be happen between BOQ as stated into the bid/tender stage & during project execution considering any other request from the end-user (project owner).

Ahmed Mohamed Ayesh Sarkhi
by Ahmed Mohamed Ayesh Sarkhi , Shared Services Supervisor , Saudi Musheera Co. Ltd.

Agree With Answer of Mr. JOHNSON DIAS 

Amr Alkubati
by Amr Alkubati , CEO Office Manager , Samaya Investment Company

BOQ is the Bill Of Quantity for the Project.

It's Important because this is a part of the contract and this is what are you going to work with it.

shashikiran talkad swamy
by shashikiran talkad swamy , site engineer , surag developers

bill of quantity, boq is important roll in quantity. same item  involved in different work slowing total qty 

Vijay Rajagopalan
by Vijay Rajagopalan , Techno Commerical Manager , AJB - HCQ General Trading LLC.,

BoQ - Bill of Quantity widely used for Any Materials related Projects, Service level projects will not have BoQ, BoQ will be useful for the  Assessment of the Project Budgeting, Timeline and also delivery. BoQ will be useful for Phase level project completion and handing over.

Hussein azhary Hussein Elhoufy
by Hussein azhary Hussein Elhoufy , Sales Team Leader , Comatrol systems

BOQ (bill of quantity ) 

in a very simple way imagine that you are making a meal first you should make a list of that meal component so you can revise it with the inventory that you have , also you will check the availability of each item and the time you will need for each item to get .....

simply its an ingredient check list

Ali Ahmed Abdurahman Alkubati
by Ali Ahmed Abdurahman Alkubati , Construction , PRIVATE SECTOR

Bill of Quantities  means the works items  calculated from the engineering project drawings  and will be prepared by the cost estimate engineers with help of others engineers which is showing all the total materials  and the cost for the projects.

 

Mohammed Safwat Oliemy
by Mohammed Safwat Oliemy , Electrical Site Engineer , SIEMENS

BOQ stands for the Bill of Quantity, it's extremely important to the site engineer to specify the material he needs and order them, for the technical office to present the financial and technical offers according to them and perform the suitable shop drawings.

Zohaib Mirza
by Zohaib Mirza , Mechanical Engineer , Saudi Services for Electro Mechanic Works

BOQ is Bill of Quantity for your whole project material . or you can say sum of your all BOM.

 

how you will complete your project without material?

 

More Questions Like This