Register now or log in to join your professional community.
a) invoices, time tickets, and the predetermined
overhead rate.
b) materials requisition slips, time tickets, and the
actual overhead costs.
c) materials requisition slips, payroll register, and
the predetermined overhead rate.
d) materials requisition slips, time tickets, and the
predetermined overhead rate.
materials requisition slips, time tickets, and the
predetermined overhead rate.
i think (b) is right
materials requisition slips, time tickets, and the
actual overhead costs.