Billy Penana
by Billy Penana , Specialty Piping Network Engineer , Parsons International Limited

The kind of acceptance for the site works is measured in terms of:

1. Compliance with the work plans or drawings, agreed work sequence and procedures or method statement.

2, Ensure that the work is being carried out in accordance with the project specification, code compliance (local, international or Authority having jurisdication), current plans, at expected quality and duration.

3. Ensure that permit to work is available and monitored in regular basis by a safety officer.

4. Work is manage by an engineer, a supervisor or foreman who knows very well the work being performed.

5. Work is verified and accepted by a quality control engineer.

 

Victor Okoye
by Victor Okoye , Health and Safety Officer , Royal Catering Services L.L.C Abu Dhabi UAE

Ensuring that the safe system of work is being followed during site work operation.

amir khusru jaami jaami
by amir khusru jaami jaami , Safety Supervisor , Descon

monitore all activity and and stope unsafe activity and train them as per reqirment on site.

Nelio Beleo
by Nelio Beleo , Civil Inspector , Petrojet

First of all, you can be accepted for supervisory jobs if you have the experience that is required for it. A supervisor should be more knowledgable than his people so it is important that he read the drawings, he know the standards and he has the ability to make decisions if needed.

To determine whether requirements met for any work or job.