What is the first step to start supervising project ?
The kind of acceptance for the site works is measured in terms of:
1. Compliance with the work plans or drawings, agreed work sequence and procedures or method statement.
2, Ensure that the work is being carried out in accordance with the project specification, code compliance (local, international or Authority having jurisdication), current plans, at expected quality and duration.
3. Ensure that permit to work is available and monitored in regular basis by a safety officer.
4. Work is manage by an engineer, a supervisor or foreman who knows very well the work being performed.
5. Work is verified and accepted by a quality control engineer.
Ensuring that the safe system of work is being followed during site work operation.
monitore all activity and and stope unsafe activity and train them as per reqirment on site.