Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

In a self-certification project, how do you verify the design quality assurance?

user-image
Question added by Danilo Carillo
Date Posted: 2016/01/11
SUTAPTA SIKDAR
by SUTAPTA SIKDAR , SB Water & Power Engineers Pvt. Ltd

System level reviews are required for all technical memorandum. Technical Leads for each subsystem are responsible for completing the reviews in a timely manner and identifying appropriate senior staff to perform the review. Exemption to the system level technical and integration review by any subsystem must be approved by the Engineering Manager. 

More Questions Like This