Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the use of PERT (Program evaluation and review technique)?

user-image
Question added by Saktheeswaran Rajendran , Mechanical Engineer , Seetech Indya Pvt Ltd
Date Posted: 2016/01/13
Mohd Sheraz Lari
by Mohd Sheraz Lari , Facility Manager , CBRE

It is used for Employee Appraisal. After the review , you can find the cream employees and also the trouble makers. But the KPI's set for the program should be selected after careful review.

Ramesh Sengodan
by Ramesh Sengodan , Supervision , SAUDI ARABIYA (FOR M/s ABB CONTRACTING LTD):

Project management technique that shows the time taken by each component of a project, and the total time required for its completion. PERT breaks down the project into events and activities, and lays down their proper sequence, relationships, and duration in the form of a networkLines connecting the events are called paths, and the longest path resulting from connecting all events is called the critical path. The length (duration) of the critical path is the duration of the project, and any delay occurring along it delays the whole project. PERT is a scheduling tool, and does not help in finding the best or the shortest way to complete a project.  

 

More Questions Like This