Register now or log in to join your professional community.
Good and suynchronized processes and materials flow
first of you should select a best location to atrract the customers.after that use a good a branded material.
Maybe legal issues such as public health and safety.
Any kind of works shall start with Engineering works,which will cover,for sure,location,air condition requirements,etc
The temperature control requirements should be met using reliable equipment.5S standards should be implemented.