Register now or log in to join your professional community.
The main cause of variation orders.
Design Engineering Documents is one of the parameter in the actual execution, these are the basis for the preparation of : a. construction drawings/shop drawings/fabrication drawings, b. materials submittals c. method statements and inspection & test plan and selection of expertise of qualified vendors/contractors.