Why in almost all hysys simulations of TEG and Amine units we place the lean TEG/Amine pump before the cooler and not cooler then pump before recycling ? Is there any problem of cavitation at low temperature ?

user-image
Question added by Namees Nazarulla , Senior Project Engineer , RACOGT, Abu Dhabi, UAE
Date Posted: 2016/03/05

In order to avoid high heat to keep the equipment from being damaged for its precious value

 

Deleted user
by Deleted user

rule of thump to be considered, always pump before cooling. Why? because you might have increase in temp after pumping which results undesired temp to achieve.

Arun Andrew
by Arun Andrew , HSSE Officer , Mai Dubai

There are several reasons:

 

1) Avoid high-temperature, expensive materials for pumps

2) NPSH

3) Controls (e.g. partial cooler bypass - they introduce additional pressure drop and may starve the pump)

 

There are designs which introduce two-stage pumping, i.e. a booster pump followed by the circulation (high pressure) pump. Some designers install lean/rich exchanger upstream of the booster pumps, if layout and NPSH allow for such design. The final trim cooler is always on the discharge of the high pressure pumps.

chandrasekaran mohan
by chandrasekaran mohan , Senior process Engineer , Abudhabi gas development company

Lean TEG pump is placed before cooler to avoid pump suction head loss in the cooler as the TEG regenerator is operating close to atmospheric pressure and hot TEG would not vaporize and pose pump cavitation requiring cooling before the pump,

Gautham Sankaraselvam
by Gautham Sankaraselvam , Senior Engineer - Process , Technip Energies Plc

As the process occurs in almost atmospheric pressure, the process cannot usually sustain head loss across the cooler. Also, the recirculation pumps are really expensive and it requires sufficient head for operation. When the cooler is placed before the pump, the chances of process (at that point) meeting the NPSH parameters of the pump is very less. so it is better to place the pump before the cooler. When NPSH parameter is not met, cavitation will occur and affect the pump internals.