Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What are the efficient methods to move heavy and bulky MEP equipment to its final location in the construction site and up/down levels?

user-image
Question added by Moataz El Sheikh , D. Technical Manager , MAG-Holding
Date Posted: 2016/03/14
Mohammed  Faisal
by Mohammed Faisal , Asst.Mechanical Engineer. , Goldenline center airconditioning llc.

As the equipments had reached the site,either it to placed on the roof top or in the floor level based to it roof top unit can be placed by chain pulley or by the transformer machines available on site.

More Questions Like This