Value Analysis
Value Analysis (VA) is concerned with existing products. It involves a current product being analysed and evaluated by a team, to reduce costs, improve product function or both. Value Analysis exercises use a plan which step-by-step, methodically evaluates the product in a range of areas. These include costs, function, alternative components and design aspects such as ease of manufacture and assembly. A significant part of VA is a technique called Functional Analysis, where the product is broken down and reviewed as a number of assemblies. Here, the function is identified and defined for each product assembly. Costs are also assigned to each one. This is assisted by designing and viewing products as assemblies (or modules). As with VE, VA is a group activity that involves brainstorming improvements and alternatives to improve the value of the product, particular to the customer.
Value Engineering
Value Engineering (VE) is concerned with new products. It is applied during product development. The focus is on reducing costs, improving function or both, by way of teamwork-based product evaluation and analysis. This takes place before any capital is invested in tooling, plant or equipment. This is very significant, because according to many reports, up to 80% of a product’s costs (throughout the rest of its life-cycle), are locked in at the design development stage. This is understandable when you consider the design of any product determines many factors, such as tooling, plant and equipment, labour and skills, training costs, materials, shipping, installation, maintenance, as well as decommissioning and recycle costs.
Therefore value engineering should be considered a crucial activity late on in the product development process and is certainly a wise commercial investment, with regard to the time it takes. It is strongly recommended you build value engineering into your new product development process, to make it more robust and for sound commercial reasons. However, Many refer to Value Management as an umbrella term, which encompasses value engineering and value analysis.
Thanks for the invite, I agree with the rest of the answers
INTRODUCTION TO VALUE ANALYSIS
Lawrence Miles conceived of Value Analysis (VA) in the 1945 based on the application of function analysis to the component parts of a product. Component cost reduction was an effective and popular way to improve "value" when direct labor and material cost determined the success of a product. The value analysis technique supported cost reduction activities by relating the cost of components to their function contributions.
Value analysis defines a "basic function" as anything that makes the product work or sell. A function that is defined as "basic" cannot change. Secondary functions, also called "supporting functions", described the manner in which the basic function(s) were implemented. Secondary functions could be modified or eliminated to reduce product cost.
As VA progressed to larger and more complex products and systems, emphasis shifted to "upstream" product development activities where VA can be more effectively applied to a product before it reaches the production phase. However, as products have become more complex and sophisticated, the technique needed to be adapted to the "systems" approach that is involved in many products today. As a result, value analysis evolved into the "Function Analysis System Technique" (FAST) which is discussed later.
agree with all colleagues answers
Value Engineering (VE) is concerned with new products. It is applied during product development. The focus is on reducing costs, improving function or both, by way of teamwork-based product evaluation and analysis. This takes place before any capital is invested in tooling, plant or equipment.
Value Analysis (VA) is concerned with existing products. It involves a current product being analysed and evaluated by a team, to reduce costs, improve product function or both. Value Analysis exercises use a plan which step-by-step, methodically evaluates the product in a range of areas. These include costs, function, alternative components and design aspects such as ease of manufacture and assembly.
Value Engineering
Value Engineering (VE) is concerned with new products. It is applied during product development. The focus is on reducing costs, improving function or both, by way of teamwork-based product evaluation and analysis. This takes place before any capital is invested in tooling, plant or equipment.
This is very significant, because according to many reports, up to 80% of a product’s costs (throughout the rest of its life-cycle), are locked in at the design development stage. This is understandable when you consider the design of any product determines many factors, such as tooling, plant and equipment, labour and skills, training costs, materials, shipping, installation, maintenance, as well as decommissioning and recycle costs.
Therefore value engineering should be considered a crucial activity late on in the product development process and is certainly a wise commercial investment, with regard to the time it takes. It is strongly recommended you build value engineering into your new product development process, to make it more robust and for sound commercial reasons.
Value Analysis
Value Analysis (VA) is concerned with existing products. It involves a current product being analysed and evaluated by a team, to reduce costs, improve product function or both. Value Analysis exercises use a plan which step-by-step, methodically evaluates the product in a range of areas. These include costs, function, alternative components and design aspects such as ease of manufacture and assembly.
A significant part of VA is a technique called Functional Analysis, where the product is broken down and reviewed as a number of assemblies. Here, the function is identified and defined for each product assembly. Costs are also assigned to each one. This is assisted by designing and viewing products as assemblies (or modules). As with VE, VA is a group activity that involves brainstorming improvements and alternatives to improve the value of the product, particular to the customer.
Note: Many refer to Value Management as an umbrella term, which encompasses value engineering and value analysis.
Reasons for Value Analysing Existing Products
The majority of the information here is geared towards New Product Development and New Product Introduction. In contrast to this, as stated above, VA is based upon products you already sell. On the face of it, the reasons for value analysing existing products may seem obvious. However you may find yourself in a situation where you need to convince others and make the case for undertaking a VA exercise. Senior managers may require justification as to why it’s worth the investment of time and effort. Below are some points that may help. Consider applying them to your specific situation.
Thank you for inviting ...... I'm not from the people of jurisdiction
I agree with Mr.Rami Assaf and Mr.Majid Valapra answers.
agree with answers .........................................