Register now or log in to join your professional community.
When it comes for best instrument installation on a certain equipment's, the contractor should follow vendors guidelines. There is always a procedures to follow on how to install, most especially on a critical and sensitive piece of equipment like Cryogenic Exchangers and Cryogenic Pumps. The best thing to do prior to the installation of instruments to the equipment is to properly coordinate with the vendors or client to avoid damages, repair and repetition of work.
Follow the engineering drawing
starting from initiating phase through planning phase and getting the approval documents needed from supplier and costumer and then insure the standard installation process to the client
using our best expertise we can install the required equipment.
The costumer can get the best instrument installation by dealing with the correct and reliable, expert ,ISO certified company or certified technician to get the job done.
1. According to Standard Hookup Drawing set for the project
2. refer to international standard that client is using for Engineering
First it depends on what kind of instrument. In general instrument each either perpendicular or parallel to the ground. It must accessible for reading, cleaning and repair or replacement. Away from hazards that my cause malfunction and damage the instrument.
Hi every body.
I think you sould follow the contructions guid at first, then communicat with the costumer to choise best inslallation of the equipement in the best palce and the right way.
Finaly the cleaned and finished work always impressive for costumers :)
you need to listen to the custmer requirments at first so due to the equipments which you have and by calculating the power consumption for every device then you can install it .
As per project spec make Method statment for installation sequence and prepare proper mainpower equipment stable area for jack lifting equipment etc.
you must install the best solution for the customer and explain to them why is it the best solution