Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the best way to detail or breakdown cabling activities, in MEP projects?

user-image
Question added by Deleted user
Date Posted: 2016/04/11
Imran Ahmed
by Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

The best way of breakdown for cabling is to consult the drawing electrical sections & detail and dscription of that item in BOQs.

The common breakdown is described below but it varies from project to project.

  1. Setting Out & Survey
  2. Excavation
  3. laying Electrical Pipes
  4. Laying Cable
  5. Laying cable tiles
  6. Foundation for light Fixtures
  7. Backfilling

Zain ul Abdin
by Zain ul Abdin , Project Planning & Control Manager , Redco International Trading and Contracting

You mean the steps like:

  • arrival of cable in store
  • placement on rolls at site
  • laying of cable
  • termination of cable
  • final check

etc., or something else ?

More Questions Like This