How could we calculate the concrete base for any mechanical equipment?

user-image
Question added by Sherif Mohammed Ibrahim , Senior Mechanical Technical engineer , Al-Latifia Trading & Contracting Company
Date Posted: 2016/04/18
Khurshid Siddiqui
by Khurshid Siddiqui , Lead HVAC Engineer , Wood Group

As a Thumb rule we take minimum 5 times the wait of equipment.

Sherif Mohammed Ibrahim
by Sherif Mohammed Ibrahim , Senior Mechanical Technical engineer , Al-Latifia Trading & Contracting Company

3 to 5 X equipment weight (ton) = density of concrete X volume = 2.5 (ton/m3) X W*L*N

MOJAHIDUL ISLAM
by MOJAHIDUL ISLAM , Plumbing Forman , Drake & Scull International Qatar

Hello SirPleasd Ansower me Plumbing Forman now job in Doha Qatar my Cont No- 0097433283256                                  Thank You                             MOJAHIDUL ISLAM

Daniel Kawooya
by Daniel Kawooya , Site Foreman , GEPA Enginering Consultants

There's quite a number of accounts to put into consideration, such as the type of mechnical equipement, it's wait and rate of vibration and the manufuctures specification, the structural Engineer's suggestion, the nature of the soils etc. Formulars for this may vary alot.