Register now or log in to join your professional community.
The substructure exposed to the filling material shall be protected with some type of chemical treatment as barrier against incoming moisture and/or waterproof protective boards/sealant or tapes in order to protect the rebar and restoring concrete durability
Since Chloride content will be high and react invariably to the conditions present, you must determine treatment strength outcome based on this. Rebar with proper irrigatiion must be present in order to reinforce the structure.
All concrete contct surfaces with back filling material having haigh chloride content must have the following: