Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

How many days curing for columns?

user-image
Question added by raja gopal
Date Posted: 2016/05/12
Mohamed Abuhashem
by Mohamed Abuhashem , Civil and Structural Engineer , Hassan Allam Construction

 7 days twice day and night

KIRANCHAND S
by KIRANCHAND S , Lead QA/QC Engineer , KAD Construction LLC

Min period is 7 days and if possible you can extend upto 28 days.It also depends on the curing technique we choose (Wet hessian cloth , Curing compund etc)

raheel bangash
by raheel bangash , civil inspector , obe architects

7 days...............................

marco farah ghattas
by marco farah ghattas , Civil Engineer , Qatar Power Construction

 in general cases7 days ......................

R MANESH RAVEENDRAN NAIR
by R MANESH RAVEENDRAN NAIR , site engineer( job performer) , NASAR SAID AL HAJRI

7 days for 50% strength .But for getting more strength need 28 days curing

riadh zemzem
by riadh zemzem , conception et calcul des structures en béton armé , B.I.E.S.CO

There is 28 day curing columns

vairamuthu subbiah
by vairamuthu subbiah , Sr.QC Inspector Civil , Galfar Engineering and Contracting

minimum requiremnt is 7 days . 

Zeiad Al-hachami
by Zeiad Al-hachami , Sr. Project Engineer , ExxonMobil Iraq Limited

Depanding on the kind of curing technique used. if normal watering is used, then 7 days minimum and left for 14-28 days prior to removing form depnending on the load on the column and its design 

Nirmalendu Sekhar Mishra
by Nirmalendu Sekhar Mishra , M.Tech Research Scholar , Indian School of Mines

7 days untill the form work is removed..28 days in total

Mohamed Noufal Pulikkal
by Mohamed Noufal Pulikkal , Quantity Surveyor/ Techincal Manager , HOWCON

Minimun 7 days in normal condition

Einston Johnson
by Einston Johnson , Project Engineer , National Piling Company

minimum Curing period is 7days

More Questions Like This