a. Deliver the highest value to the customer with each deliverable
b. Evaluate multiple project solutions that will deliver the highest value to the customer
c. Calculate the cost of doing the work versus the value that is delivered
d. Reduce project costs without sacrificing scope
d. Reduce project costs without sacrificing scope
D – Value engineering is a technique that is used to look for ways of reducing costs without sacrificing features or scope
I think that Option 04 is the best answer
thanks for invition ,,,,,,,,,, my choice is option D
a. Deliver the highest value to the customer with each deliverable
agreed with answers
thanks.,..................
minmize the cost within saftey conditions thru design parameters,design reviewing and project specs to enlarge the profit.
The answer is already given by experts. Thanks