Register now or log in to join your professional community.
A. Acceptance sampling.
B.% inspection.
C. Variable lot inspection.
D. A and C.
My opinion is the answer is:
D. A and C.
Acceptance sampling and Variable lot inspection.
Option A is correct answer, option A cover option C as well.
Acceptance Sampling is appropriate answer because that will cover all aspects.
Definitely D
You have to do variable lot inspection, and acceptance sampling
Option A,.....
Thanks.........
thanks for invition ,,,,,,,,,, my choice is option D