Register now or log in to join your professional community.
As-built drawing is change for the site condition. After this drawing is prepare submittal and submit to the client for approval.
As-Built is the drawing that represents the final construction of a facility or sytem; it is the culmination of the IFC (Issued for Construction) drawings you being with, and the Red-Line drawings that are added during construction that show deviations from IFC with all justifications for such.
As- Built drawing: that drawing reprsent the final construction work in site.
Document Controlled Copy (DCC) : that drwaing for all construction work, that updating every any update are available.
AS buit Drawing: Revised set of drawing submitted by a contractor upon completion of a project or a particular job. They reflect all changes made in the specifications and working drawings during the construction process, and show the exact dimensions, geometry, and location of all elements of the work completed under the contract. Also called record drawings or just as-builts.
A controlled document can be modified, reviewed and redistributed multiple times over its life cycle. This type of document is typically used for a reference, with some examples being technical drawings, procedures, data sheets, application forms, plans or contracts. Any revisions made to a controlled document cause it to supersede the version that came before it. Companies or organizations can manage controlled documents using either management software or by following the International Organization of Standards' quality assurance guidelines. A typical tracking method for controlled documents allows for a process that includes revision, approval and distribution. An ISO procedure can also include methods that deal with obsolete versions of controlled documents.
AS BUILT it means final issue of the drawings after construction and CONTROLLED COPY means ISSUED FOR CONSTRUCTION drawings used for site work.
"As built" is the term used for Construction Engineering drawings.
If we use any higher section instead of actual designed section shown in drawing then we have to show that actual section in drawing and submit it to client.
Assist in the review for the as built Drawing As Built Drawing are Produced and maintained during construction of all project. an as-built drawing annotates any field changes that differ from the original design. this includes, but is not limit to the following discipline
civil / Architectural/ Structural / Mechanical / Electrical / Instrumentation / Electronics.
As-built Drawing are kept during all phase of a construction project. the construction coordinator assure the as built drawing maintained by all foremen working on the project at the completion of the project the construction coordinator provide the project engineer with one sate of as built drawing for further information on change request.
As built drawing is Final Drawings with All Modification in work shop and site Erection .
This Drawing preparing by Sub Contractors .
All build dawing are maintain during construction work of different engineering departments
A set Of drawings submiited by a customer for revision or for finding the Area, weight, Perimeter & Total Perimeter. this Command is use to copy the Drawing Object to another template. etc.
As built drawing prepare after completion of the project.
Document control copy, drawing issue during work with IFC seal.