Following are some compensable delays• Owner’s failure to furnish the site to the contractor by an agreed date
• Faulty design
• Incomplete drawings and specifications
• Changes in scope
• Suspension of work
• Differing site conditions
• Late delivery of owner-supplied materials
Climate, Accidents, Unavailability of materials and call of nature.