Many steps needs to be taken. You need to determine:
Then you need to combine all these points into an efficient execution plan.
Development of master plan which consists of procurement plan, execution plan, resource plan, cost plan, audit/inspection plan etc.
the second step is to prepare the procurement schedule
I fully agree with the experts submissions here regarding this matter.
Thanx forvthe invitation
I believe that once the engineering part is done it's followed by the Project Close-out Phase. This phase consists of the following.
1. Post Implementation Review
2. Performance review
3. Lessons Learned
4. A final Project Evaluation
5. Delivery of Final Documentation
6. Project Sign-Off
7. Customer Satisfaction Survey
After engineering step I will evalute the protype on test envoironment
The main issues that must be addressed for the successful completion of a project are related to time and cost. We must, first estimate the likely duration of the project and the organizing way to minimize its cost and its duration (so that the resources committed are as short as possible and that it can become operational as soon as possible) .