Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What are the main criteria of the provision of quality maintenance contract and what are the means to achieve it?

Malfunctions of equipment affect more than one in two businesses. Maintenance is essential to limit the risks. But how to choose the right provider? Review of the top ten criteria to take into account, including the ability to deploy an approach to predictive maintenance. System maintenance is central, in which predictive analytics taking an increasing share. In this context, choosing the right provider proves all of course crucial.

user-image
Question added by Charif MEFTAH , Technicien puis ingénieur METHODES MAINTENANCE , SPIE
Date Posted: 2013/05/05
Peggy Traboulsi Chamoun
by Peggy Traboulsi Chamoun , Marketing Director , Bayt.com

Quality maintenance contracts provide detailed analysis reports for the quality control, the material used, the structure implemented, the system in place...etc.
for a particular project or item.
It is meant to provide quality assurance and confidence for each of the above mentioned activity.
In order to achieve a high standard quality maintenance contract it should be based on detailed analysis and specs for each activity to be produced and implemented.
A Demo for each activity would also help.

Muhammad  Usman
by Muhammad Usman , store manager , Glaxy Broadcasting Network PVT

Payback period analysis Accounting rate of return Net present value Internal rate of return

laid hamli
by laid hamli , Certificat d’État Cadre etudes techniques (Maint) , Sonatrach des Hydrocarbures

1 question: les principaux critere d'un contrat  de maintenance sont: le materiel,instrument de controle et testing (appareillages plus perfectionnés)

2 question: le genre de rapports pour commencer a demander c'est hausse des revenus.

3 question: AHU niveau de puissance acoustique transmis vers l'exterieur de la central

FCU sont utilisé dans espaces plus petit et souvent seulement locaux

4 question il ne recois aucun emploi parce que la specialité se differe.aeronefs c'est un moyen de transport capable de s'élevé et de se mouvoir en altitude.

DGAC a pour mission de garantir la securité de transport aerien.

5 question central d'appel: c'est un central publique principal de telephone qui se compose de 10.000 lignes est plus.

6 question le programme le plus utile pour la gestion,on doit utilis" le programme de Maintenance et d'impression pour voir l'etat de la liaison line.

The choice of the correct equipment for the particular job and site conditions is paramount from the onset of any project.

Having the OEM understanding your needs and ensuring meaningful business relationships in providing the level of backup required in both technical and aftermarket spares is crucial. 

Effective management with, daily maintenance, planned maintenance, planned change outs of major components, rapid response to any breakdown with critical parts on site is an absolute must.

Machine Condition Analysis reports on regular periods and corrective actions. Using MTTF and MTTR programs are key guide lines.

 

The human element is ever present, no maintenance contract will be a success without motivated, disciplined and well trained employees and the correct management style in place. 

 

Ajith Kumar Chandrangadan
by Ajith Kumar Chandrangadan , ASSO VICE PRESIDENT , ADANI POWER

Deliverables under the contract needs to be clearly specified.
Time period / duration of the delivery should also be clearly mentioned.
A qulity plan for various activities needs to be in place.

More Questions Like This