A. phase exit B. kill point C. stage gate D. a and c E. all of the above
your answer is E (all of A, B & C)
and based on my experience:
at the top is Safety requirements, the project should meet all the safety requirements
after safety, the most important key deliverable is Quality of products
in3rd place, OE (or OEE) of the line or machine would be the important deliverable
Option-E all of the above.......................................................