Considering above mentioned incident ,What should you do?

You are running a project to develop the production process for a futureelectronic component. Evaluating some first test batches, you found out that the precision is generally very good, but that you have some irregular outliers in a completely unpredictable pattern.

A.  Ignore the outliers; they are not relevant as long as the yield from theproduction is sufficiently high.B.  Try to increase the accuracy of the process by adjustments, thus reducing the number of outliers.C.  Inform the designated production manager of your observations and ask him to take care after handover.D.  Research outliers, they may give you important insights into problems which may trouble later production.

user-image
Question added by DR MD ANWAR HOSSAIN , Moderator , bayt.com
Date Posted: 2016/10/13
Ihab Zaki
by Ihab Zaki , Chief Technology Officer (Cto) , EGID

I choose answer C, thanks for the invitation

mamoun mokhtar
by mamoun mokhtar , general manager , albyan technical foungary

C.  Inform the designated production manager of your observations and ask him to take care after handover

Krishna   KHASANIS  PMP
by Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Thanks for the invite.

I will go with option D .

Deleted user
by Deleted user

Option C is my answer .

 ..Thanks for your invite ..

ACHMAD SURJANI
by ACHMAD SURJANI , General Manager Operations , Sinar Jaya Group Ltd

my answer is C, inform what happened to your manager

ghazi Almahadeen
by ghazi Almahadeen , Project Facilitator , Jordan River Foundation

Thanks for the invite ............................d

hisham abu dagga
by hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Option C 

_______Thanks for invitation_________

Abdul Rehman
by Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. My answer is D

MOHAMMAD MAHMOUD HASAN AL-HASHASH
by MOHAMMAD MAHMOUD HASAN AL-HASHASH , مدير صيانه , شركة الاستراتيجي للتجاره

the correct answer is C and D

 

regards

Ahmed Hejazi
by Ahmed Hejazi , Projects Manager , Jadat Itqan Consulting - JIC

C.  Inform the designated production manager 

AISSA OULED HADJ BRAHIM
by AISSA OULED HADJ BRAHIM , رئيس مشروع , ُEco S est

je préfère la réponse : B. Essayez d'augmenter la précision du processus par des ajustements, réduisant ainsi le nombre de outliers.