How can electrician sychronize2 to3 to4 generators system with out relay failure, and the circuit of parrelled connection voltage equal, frequency and RPM equal to close the circuit power supply?
In cause we need more power or to sharing loads
TO Deliver or to Add power to an electrical power system your device/generator must be syncronized in frequency speed and voltage with the running system.
or simply your device or generator waveform should be a copy(the same) as the running system to add power to the system ,,
a simple example is Enphase Micro inverter use to match solar power the the grid power line.
Running multiple Generator in parallel condition will increase the load bearing capacity of plant. as well as the system voltage and frequency operate in less deviation due to synchronized operation. increases sustainability of plant.