Register now or log in to join your professional community.
The compaction test on back filling is carried out, in order to remove the air voids in the layers, to remove the water pore pressure, to get maximum capacity of load limit and to stabilize the layer in order to make the stability of carrying the load
To get the density required of the back filled materials to resist the load.
it will be remove from the soil profil ,,because we will not make the foundation on refill soil