The WBS means Work Breakdown Structure
Work Breakdown structure ---------------------------------------
WBS is the work breakdown structure
Thanks for the invitation. WBS is the division of project deliverables into different manageable components.
I agree with colleagues answer
Thank you for the invitation
work breakdown structure (WBS)A work breakdown structure (WBS) is a chart in which the critical work elements, called tasks, of a project are illustrated to portray their relationships to each other and to the project as a whole. The graphical nature of the WBS can help a project manager predict outcomes based on various scenarios, which can ensure that optimum decisions are made about whether or not to adopt suggested procedures or changes.
W.B.S IS WORK BREAK DOWN STRUCTURE . IS TO DIVIDE THE PROJECT INTO DIFFERENT SECTIONS TO MONITOR AND ARRANGE ACTIVITIES , IT IS MORE OR LESS CONTROLLING THE PROJECT INTO DIVISIONS BY THE CONCERNED PARTIES
WBS is a terminology used in project management which means "work breakdown structure" or in other words "work broken down into smaller activities and arranged in proper sequence to form a structured work, each of these smaller activities measurable in time
It is a logical breakdown of large tasks into smaller executable and measurable sets of works delegated to specialized man power and controlled within a predefined set of specifications, time and cost.
Thanks for invitation
Its meaning - Work Breakdown Structure And each word have its details !!!