A. risk assumption
B. risk assignment
C. risk delegation
D. risk deflection
E. risk mitigation
Thank you for the invitation. My answer is D
_______________option (D) is the correct option
__________
My answer is for option (D)
Option D - Risk Deflection. Thanks for your invitation.
Transferring or Deflection by sort of a contract. Option D
the correct answer is D. risk deflection
Even though, it might be risk control as in giving a specialist what he can do better than us.
In the absence of Risk Transfer option , I will go with option D - risk deflection.
E. RISK MITIGATION
this could be a right answer because assigning part of work means we are mitigating
Answer is A - because is a matter of assume the responsibility of:
1. choosing a contractor
2. taking a risk that the contractor can deliver that part of the project
3. assume the risk and the possible consequences that comes with the decision of delegate the part of project
I seem D option is appropriate answer.