every shop center should have a P M O
in order to manage the maintenance of each car as follow:
*every car should have a maintenance JOB order before any repairing actions
*every car should be inspected by a smart professional technician
*every car should be maintained according to the inspection sheet
*the necessary spare parts should be replaced according to the technical report
*after the process of repairing each car should be tested and evaluated by engineers to have QA
Thank you for invitation & necessary information.
Well, PMO is the best option , although different people have different working style and planning.
the answer is set up a PMO
Thanks for invitation
my answer Set up a PMO
Thanks for the invitation. I agree with your explanation.
I would say the best option is to set up a PMO.