Register now or log in to join your professional community.
Fast track the project if overall project risk is too low التعاقب السريع للمشروع اذا كانت مخاطر المشروع الكلية منخفضة
Acquire more resources for the critical path activities if the project is over budget الحصول على المزيد من الموارد لأنشطة المسار الحرج إذا كان المشروع
Request an extension of the project due date طلب تمديد الموعد المقرر للمشروع
Use less experienced team members إستخدام أعضاء فريق أقل خبرة
International trainer ENG . Hassan Shalaby
Use common sense and do the required , may one of them , may be all of them or may be something else.
I think fast track is good option
Fast track the project if overall project risk is too low
I am neither an Engineer, nor was I ever in position to run a Project with such a title :-))
Thank you for the invitation
Thank you for the invitation. My answer is "Fast track the project if overall project risk is too low "
My answer is for the first option -- Fast track the project if overall project risk is too low