Define "critical pass method?

manpower,equipment & organization are tools to draw right schedule which allow you to kill all tasks forming what ever project.

user-image
Question added by Salah Abdel Ghafar Ibrahim Abdel Rhman Al- Saada , Senior Project Engineer , Qatar Project Management[QPM]
Date Posted: 2013/10/03
Hamzeh Nizam
by Hamzeh Nizam , Project Manager , خطيب وعلمي

it organizes the optimal relations between cost and time (at defined case of resources) and also shows processes which have an effect on project time and cost

Subhranshu Ganguly
by Subhranshu Ganguly , Quality Analyst. , WIPRO

I think it means the most economic way to go from one step to the next. It is very important for the construction industry. When you join all the dots in the crtical path method you finish your job in the best way. There is a trial and error factor involved.   You may not get the critical path at the1st go but get it the next time. But once you get it you do not change the path.

Muhannad AbdulRaouf
by Muhannad AbdulRaouf , Structural Designer (Freelancer) , Freelancer

The critical path method (CPM) is a step-by-step technique for process planning that defines critical and non-critical tasks with the goal of preventing time-frame problems and process bottlenecks. The CPM is ideally suited to projects consisting of numerous activities that interact in a complex manner

محمد صالح بن جحلان
by محمد صالح بن جحلان , إدارة العلاقات الحكومية والميناء , مؤسسة إنجاز الفنار للمقاولات والتشغيل والصيانة

أسلوب المسار الحرج (CPM) هي أداة قوية تسهل وضع الجدول الزمني للمشروع وتخطيط موارد المشاريع المطلوبة. في المقام الأول، المهام المذكورة في تحليل المسار الحرج هي تلك التي تركز على الانتهاء في الوقت المناسب من المشروع ككل. كما أنه يوفر نظرة ثاقبة للمهام التي يمكن تعليقها في حالة الحاجة إلى موارد يمكن تخصيصها لاستكمال مهام المشروع الحرجة