What are you likely to see as a project progresses in a schedule with must fix dates and little or no slack?

 

A. Idle resources

B. Negative float

C. Lots of free float

D. Positive float

user-image
Question added by Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
Date Posted: 2017/01/28

My answer is for option (B) Negative float

hisham abu dagga
by hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thanks for invitation

Option A

Deleted user
by Deleted user

Thanks for Invitation:

 

My answer is A) Ideal Resources

Jomy Issac
by Jomy Issac , Sr. Quantity Surveyor , Nakheel PJSC

My answer is for option (A) Idle resources

Abdul Rehman
by Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thank you for the invitation. My answer is B

يوسف دمدوم
by يوسف دمدوم , مهندس و مسير , مقاولة اشغال البناء

Think you for the invitation

       my answer is B negative float

 

Krishna   KHASANIS  PMP
by Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Thanks for the invite ; I would go with B - Negative Float.