How can a Manager set up the Good Controlling system in an Organization?

user-image
Question added by Hamra Ghouri
Date Posted: 2017/03/10
Ashraf E. Mahmoud (PhD)
by Ashraf E. Mahmoud (PhD) , University Lecturer, Freelancer Consultant and Trainer for Int'l Business & Banking TF. , FreeLancer

Thanks for invitation,

Setting a good control system depends the following:

1- Clear goals and objectives ( i.e. Quantitative X Timing).

2- Good operations budget and action plan.

3- Providing all required resources ( including materials, finance, technical professionals,....).

4- Good supervising,following up and correction actions during process and implementation.

5- Comparing results with goals and objectives and setting up any needed procedures.

Imtiaz Ahmed Khan
by Imtiaz Ahmed Khan , Manager Sales , Naseem Al Bahar Textile Trading

A good management control system stimulates action by spotting the significant variations from the original plan and highlighting them for the people who can set things right.

In most situations, managers can avoid some control problems by allowing no opportunities for improper behavior. One possibility is automation

Another avoidance possibility is centralization, such as that which takes place with very critical decisions at most organization levels. If a manager makes all the decisions in certain areas, those areas cease to be control problems in a managerial sense because no other persons are involved.

A third avoidance possibility is risk-sharing with an outside body, such as an insurance company.

Finally, some control problems can and should be avoided by elimination of a business or an operation entirely. Managers without the means to control certain activities, perhaps because they do not understand the processes well, can eliminate the associated control problems by turning over their potential profits and the associated risk to a third party, for example, by subcontracting or divesting.

 

 

Md Fazlur Rahman
by Md Fazlur Rahman , Procurement Specialist , Engineering and Planning Consultants Ltd

Thanks for invitation.

Setting good control mechanism techniques are:

1. Prepare detail office work plan based on office objectives.

2. Review Job description(JD) of employees and update as necessary to accomplish office work plan.

3. Based on JD, set-up Key Performance Indicators(KPI) of each employees as well as for yourself.

4. Check budget variance on monthly basis and analyze the reasons for budget variance.

5. Have monthly meeting with all employees and discuss the progress and how to catch up the backlog, if any.

6. Sent copies of monthly progress report to the senior management  for information as well as for advice  and take follow up actions accordingly

 

Omar Saad Ibrahem Alhamadani
by Omar Saad Ibrahem Alhamadani , Snr. HR & Finance Officer , Sarri Zawetta Company

Thanks

In my opinion, he needs to plant the culture of commitment between his employees and teams before setting up controlling system technically, that will help him to ensure real outputs from mentioned system

Obaid ur Rehman
by Obaid ur Rehman , HR Executive , Al Bahr Al Arabi Marine Engineering Services

By forming Hierarchy and strictly following it.

samer abokela
by samer abokela , مدير موارد بشرية , مستشفى عقبة بن نافع

thanks

Work to increase the loyalty of the facility as a system for the movement of documents and tracking system for workers put

simon Toyiring
by simon Toyiring , REGIONAL SALES MANAGER NORTH ZONE 1 , FAREAST MERCANTILE NIGERIA LTD

1.When he use managerial functions and  skills effectively and efficiently

2 Good customer relation

3 Good communication skills