Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What kind of most common documents can be received on an construction site?

user-image
Question added by Deleted user
Date Posted: 2017/03/25
Murel Fabricante
by Murel Fabricante , Killa Designs , KILLA Designs

drawings, letters, specifications, report, rfi, IR, Material samples etc.

Mohamed Abdelraouf Moussa Ghazy
by Mohamed Abdelraouf Moussa Ghazy , Senior Document Control , Arabian Rafters

Letters, Submittals, Work permission, Request for inspection (RFI) & Reports

ASIF HAFEEZ
by ASIF HAFEEZ , DOCUMENT CONTROLLER , PRESSON DESCON INTL PVT LTD.

There is lot of documents are involve in an project construction site, but mostly two type of documents (Quality and Engg. deliverables) are used.

Quality documents are consist of (QIP's, Method Statements, Request for Inspection & Testing, Tech. Query Sheets, Quality Alerts, CAR & PAR, WPS, MTC's, NCR's, Test Packs, Punch Lists etc.).

Engg. Deliverables consist of (Foundation & Detail Drawings, Plan, Elevation & Section Dwg., P&ID's, GA Drawings, Piping Isometric Drawings, Red Markups etc.).

 

And also Transmittals.

REHAN AHMED
by REHAN AHMED , QA/QC CIVIL ENGINEER , ARRIYADH NEW MOBILITY (ANM)

1.contract paper 

2.approved shop drawing

3.approved method statement

4.Approved inspection test plan

5.Material approval list

6.Quality management system

7.Quality policy

8.Quality control plan

9.Health and safety plan

Mohamed navas P K
by Mohamed navas P K , Document Controller , Qatar Building Engineering Company

Drawings,RFIT,Material subamittal Approvals,Reports, approval,and General Transmittal,NCR's,CAR,Method Statement.

Fawaz Alnassar
by Fawaz Alnassar , Head Of Human Resources , Alrashid industrial

The construction contract.

Akash Patras
by Akash Patras , Officer Document Control , Emarat Europe Fast Building Technology Systems Factory L.L.C

Letters, Tranmittals, Non Conformance Report, Site Instructions, Request for Information, Confirmation of Verbal Instruction, Invoices, Interim Bills, Variations, Tender Drawings, Authority Approved Drawings, Issued for Construction Drawings, NOCs, Permits, Material Submittals, Pre-qualification Submittals, Method Statements, Shop Drawings, Technical Submittals, Document Submittals, Work Inspection Requests, Material Inspection Requests, Daily Progress Report, Weekly Progress Report, Monthly Progress Report, Baseline Program, Minutes of Meeting, Operation & Maintenance Manual, Warranty/Guarantee Certificate, As Built Drawings

Zahid Riaz
by Zahid Riaz , Senior Document Controller , Dar-al-Riyadh Consultant

Drawings 

letters

reports

RFI

MIR

Material sample

FCR

ETC

Deleted user
by Deleted user

The most common documents can be received on an construction site are drawings.

Jalandoni Minimo
by Jalandoni Minimo , Lead document controller , AECOM Arabia

Letters, RFI, Technical Queries/Interim Payments/Variation are the most common. But in the part of 80% of the project, submission such Field Change Report which need to be commented by Consultant as well, As Built Drawings.

Gregory Morta II
by Gregory Morta II , Document Control / Admin Support , Railway Project Management Company

Letters. Material Submittals, Request For Inspections, Shop Drawings, As Built Drawings, Bill of Quantities, Interim Payment Certificates

More Questions Like This