You are a project manager of ABC company. You are currently finalizing requirements with two stakeholders BUT both stakeholder has different view on?

requirements for the same project. How can you resolve the issue?

A. look at why there is different view on requirements and discuss with both of them

B. look at why there is different view on requirements and finalize which looks good to you

C. ask your manager to deal with this

D. finalize requirement which looks good to you

user-image
Question added by Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
Date Posted: 2017/04/07
Muhammad Shuja  Khan
by Muhammad Shuja Khan , EX Resident Manager & Regional Manager , Security Consultant , Practicing Lawyer at the High Court , Shell Pakistan Limited (2004-2014)

I shall draw the attention of both stakeholders to the prescribed issue related  TORs and bring them to an agreement

Robert Malak
by Robert Malak , Projects Manager , Ankido Oil Services for General Contracts DMCC

 

I believe that the best suitable answer is A.

 

A. look at why there is different view on requirements and discuss with both of them

DR MD ANWAR HOSSAIN
by DR MD ANWAR HOSSAIN , Moderator , bayt.com

Thank you for invitation. I seem option A. look at why there is different view on requirements and discuss with both of them is a good answer.

Nour El-Din Salama
by Nour El-Din Salama , Senior HSE Engineer Oil& Gas General Constructions , The Petroleum Projects and Technical Consultations Co.

requirements for the same project. How can you resolve the issue?

 

A. look at why there is different view on requirements and discuss with both of them

 

B. look at why there is different view on requirements and finalize which looks good to you

 

C. ask your manager to deal with this

 

D. finalize requirement which looks good to you

hisham abu dagga
by hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

 

Thank you for the invitation

Thanks for the information 

 

I Agree Option A

Abdul Rehman
by Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. My answer is A