Register now or log in to join your professional community.
§Civil construction on industrial project as concrete works (Pouring/ Protection/ Backfilling), Concrete placement Concrete rehabilitation & Curing methods include pre-cast elements, Scaffolding, Plumbing, Duct works ,Roads structural modification, Buildings, Refractory, Insulation, Masonry and Painting of structures & industrial cleaning.
§ Reinforcement Concrete for Sub & Super Structure Work, Light / Heavy Equipment & Pipe Rack Foundation, U.G Tanks, Foundation Building, Steel Structure & RCC Slab, Process/ Non Process Buildings, RCC Pavement for Non Crane & Crane road, Cable Trench, Duct Bank, Pump Station, Manhole, Culverts & Dyke/Drywall works etc.
§ Piling works (Bore Pile cast in situ and Driven Pile cast in situ), Boring and Horizontal Directional Drilling.
§ Civil Earth works, grading and leveling,Surfacing ,Excavations, back filling, Earth and Water retaining structures, Pipeline Corridors crossing, Trenchless crossing, Road Crossing, Underground pipes laying, Rock Blasting,Top soil remove , Pipe Stinging ,Excavation of Trench, lowering of Pipelines,Soil / Sand Bedding, Padding ,Dressing, Compacting works & clean up, Repair/Restoration of ROU& all mechanical completions works, Well head control panel facilities-Covering, Grounding Cable Laying(Cable Tiles /Warning Tape/Route Marker installation etc.
§ Transmission Line and Electrical Sub-station Project connected with Onshore/Offshore Power cable installation including, Ponds and Pump Stations, River, Dams, Soil investigation /stabilization, Step grading, setting out of Cable route, Stub setting, Conveyor Pipeline, storm water system Drainage & Sewage system layout with ducting.