Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Which time we can use core test?

user-image
Question added by Mahmoud alsouqi , Project Engineer , TECHNICAL ARAB CONTRACTING GROUP
Date Posted: 2017/04/30
يوسف دمدوم
by يوسف دمدوم , مهندس و مسير , مقاولة اشغال البناء

Thank you for the invitation

to be a concrete sample test several times so we can see the resistance to pressure and be on the second day of pouring concrete, third, seventh and fourteenth and twenty one twenty-eighth to reach maximum resistance

Engshams Civil
by Engshams Civil , مهندس مدني عام , مكتب هندسي

This test is used after the failure of the results of the examination of compressive strength of 28-day concrete samples, after which the hammer test is used, the results of which are inaccurate and can be considered as a predictor for the results of our core test

hisham abu dagga
by hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thank you for the invitation

Agreed with colleagues

With greetings and appreciation

Muhammad Farooq
by Muhammad Farooq , QA-QC Manager , AL Bawani Contracting Co

when concrete cylinders (Average of three) did not achieve required concrete compressive strength then cores are taken(Average of three) and shall be min 85% of reuired concrete strength. The individual shall not be less than 75% of reuired concrete strength.

Murat ÖZ
by Murat ÖZ , Construction Superintendent (Electrical) , Al EZZA

Since 09:30 to until  12:30

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.