Is PPAP necessary to approve a supplier? Why?

Can we switch PPAP process?

user-image
Question added by Badsha Khan , Senior quality engineer , IGW India limited
Date Posted: 2017/05/02
Nilesh Patil
by Nilesh Patil , Manager , Windals Precision Private Limited.

1) PPAP is applicable for production of new developed part /product.

2) For new supplier approval supplier evaluation / audit is applicable.

Rakesh Ashabhai Patel
by Rakesh Ashabhai Patel , Field/Plant Coordinator Mechanical Engineer , QATAR SHELL PEARL GTL ON BRUNEL

To provide shortage materials, repair and service from outsource approved vendor, parts to increase euipment availibility for  continuous process plant and finally raise the productivity in respect of finance, safety of plant asset, employee hence to obtain reliability.

Praveen Nathan
by Praveen Nathan , Senior Engineer , Roots industries India Pvt Ltd

  • Through PPAP documentation supplier can understand the Customer needs and requirements
  • By running the PPAP element during the development stage we can achieve defect lunching and it will make the way to improve quality with low cost of investment in terms of long period 

Manu Sebastian
by Manu Sebastian , Quality Assurance Engineer(Plant QA head) , Harita Seating Systems Ltd

No. To approve a supplier, supplier assessment/audit is applicable

Muthu Kumar
by Muthu Kumar , Mechanical Supervisor , EL-SEIF Operation & Maintenance

PPAP is applicable for production of new developed part /product.

Chitharanjana Shetty
by Chitharanjana Shetty , QA/QC Engineer and Internal auditor , Shrinivas engineering Auto Components Pvt Ltd

Yes. Supplier having documented proof for all customer specific requirement is met in this new part development.

Nikhil Prajapati
by Nikhil Prajapati , Quality Engineer , Aanjaney Micro Engg. Pvt. Ltd.

Yes, PPAP is necesssry to approve a Supplier. Because PPAP documentation provides better understand about the new part/product development and get all answers from process flow chart, control plan that are to be arised when new part/product development.

anirudha chavan
by anirudha chavan , Asst Quality Assurance Incharge , SRF machine shop

PPAP Documentation is overall neccesary also in respect with Supplier evaluation. PPAP Basically Provides Basic Answers to Questions that are to be meet while new product is developed. It also determines wheteher the supplier is capable or not to meet the requirements of the customer. 

Deepak Tribhuvan
by Deepak Tribhuvan , Manager , Precision Autowares Pvt. Ltd

PPAP gives us confidence for customer that Process is well established with with all reuired necessory steps to approve product quality . Only PPAP is to approve a supplier approval. But approved supplier has to gone thru PPAP , APQP , , Capability , Assessment , selection and Evaluation processes.

Question is very clear that PPAP is necessary to aprrove a supplier. Hence yes , But not only to limited PPAP. PPAP is necessary for product / Part approval.

Mohammed Zainul Aabideen
by Mohammed Zainul Aabideen , Intern , Hanon Automotive Systems

Production Part Approval Process (PPAP) provides confidence to  customer that their supplier is indeed capable of reaching the level of quality the customer desires by manufacturing the product as the customer wants it to be. This is demonstrated by a set of documents proving that the product can be manufactured with desired quality and in a desired quantity by the supplier hence providing satisfaction to the customer. 

Yes,  PPAP is necessary to approve a supplier. Because  manufacturing process that the supplier choose to meet a design record should be judged through process flow  diagram, a part of PPAP.