May it possible 600kva synchronize with 1000kva with a load sharing ?

synchronizing operation

user-image
Question added by Muhammed Aamir Khan , Construction Manager , GAM Arabia Ltd
Date Posted: 2017/10/15
Muhammed Aamir Khan
by Muhammed Aamir Khan , Construction Manager , GAM Arabia Ltd

yes with ComAp InteliVision 5 controller solved this problem with very good results both units are taken the load like 30%, 65% both of rated capacity and operation run smoothly. @30% load 600kva is 143kw and 1000kva is 244kw and @65%load 600kva is 316kw and 1000kva is 516kw.