Which of the following should be done by the project manager upon completion of the project? A. Planning a turnover meeting. B. Obtaining a sign-off from the customer. C. Team celebration. D. Project evaluation. E. Performance evaluation of team members.
E. Evaluación del desempeño de los miembros del equipo.
drilling or workover engineer.
B. Obtaining a sign-off from the customer.