Register now or log in to join your professional community.
How to evaluate residual risk?
we can manage the residual risks by:
1- avoide this risks by isolating from surround and/or find a suitable alternative
2- reduce the level of risk by consider it under work permit tasks, which is need new risk prediction befor issuing the work permit.
3- accept it, in case the local regulation accept that kind of residual risks
4-transfer it to another location to reduce the level of accessability to residual risks.
Thank you for invitation
Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.