Question added by
محمد محمود عبد الحميد عثمان
, CONSULTANT CIVIL ENGINEER ( ROAD CONSTRUCTION) , CONTRACTOR OFFICE IN ELFAYOUM CITY
Date Posted: 2013/05/15
by
محمد محمود عبد الحميد عثمان , CONSULTANT CIVIL ENGINEER ( ROAD CONSTRUCTION) , CONTRACTOR OFFICE IN ELFAYOUM CITY
FIRST WE HAVE TO DO THE SURVEY WORK BY USING GPS STATION AND PICK AT LEAST TWO CONTROL POINT AND THESE TWO POINTS WILL CONTROL ALL SITE
SECOND WE BEGIN TO MAKE SURVEY WORK BY USING TOTAL SATAION AND PUT THE COORDINATES WHICH WE HAVE IN TWO CONTROL POINTS SO WE CAN GET THE EXACT SURVEY WITH MINIMUM ERRORS
THIRD WE TAKE POINTS (XYZ) OUTPUT AND PUT IT IN AUTOCAD LAND AND WE HAVE TO MAKE FULL SURVEY WITH LOCATION SITE DETAILS ( ROADS, STREETS, SIGNS, ETC) AND LOCATE THESE DETAILS IN SURVEY AND MAKE A CONTOUR MAP
WE HAVE TO LOCATE THE BRIDGE CENTERLINE AND THE TWO EDGES OF THE BRIDGE IN OUR MAP DETAILS
WE HAVE TO DRAW A PROFILE FOR THE CENTERLINE OF THE BRIDGE AND FOR THE LEFT AND RIGHT BRIDGE
WE BEGIN TO DRAW CROSS SECTIONS BRIDGES IN CENTERLINE PROFILE AND LEFT AND RIGHT EDGE PROFILE OF THE BRIDGE
THE THE AUTOCAD LAND WILL GIVE ME EXACTLY THE (XYZ) LOCATION OF THE CENTERLINE AND LEFT BRIDGE EDGE AND RIGHT BRIDGE EDGE
END
MOHAMED MAHMOUD