A. The critical path method performs a forward pass analysis and backward pass analysis through the project schedule network paths. B. Critical paths have either negative or zero total float C. On a network path, the schedule flexibility is measured by the difference between early and late dates D. The critical path method calculates the theoretical early start and finish dates for all schedule activities E. The critical path method accounts for resource limitations
Critical path mesuerement used based on your Planning scope of work that are being carried out [Control System].
C. On a network path, the schedule flexibility is measured by the difference between early and late dates
The critical path method (CPM) is a project modeling technique.
E. The critical path method accounts for resource limitations
The critical path method (CPM) is an algorithm for scheduling a set of project activities. The critical path method (CPM) is a project modeling technique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand. Kelley and Walker related their memories of the development of CPM i
E. The critical path method accounts for resource limitations